Applications · Bridge Preloading

Ton bags for bridge preloading

In bridge preloading, ton bags filled with sand, soil or aggregate are placed on the falsework or foundation as a test load before the real load is applied, so engineers can check bearing capacity and settlement — for example the bearing capacity and rebound of steel-pipe foundations. Mingzhe recommends open-top or duffle-top 4-loop bags for fast loading, or reinforced belt bags for heavier loads.

01Materials

What you can pack

  • Sand, soil or gravel used as test load
  • Preloading of bridge falsework (support frames)
  • Bearing and rebound tests on steel-pipe foundations

02Options

Useful options

  • Load per bag confirmed per specification
  • Heavier fabric weight for abrasive aggregate
  • UV stabilisation for outdoor use — available on request
  • Bags designed for reuse — discuss with us
Full FIBC bag lifted by four loopsA loaded white FIBC bag lifted by its four loops in front of stacked finished bags.

Contact

Tell us what you pack — we will propose the bag

Send your product, fill weight and how you fill and empty the bag. We reply with a recommended structure and a quotation.