Guide · Design
One-loop, two-loop or 4-loop bulk bag: which lifting style should you choose?
Choose the lifting style by the hook, fork or crane you use. A single loop suits fast single-hook crane handling. Two loops suit forklift or two-pin lifting with fewer parts to sew. Four loops are the most common and the most stable for forklifts, cranes and pallets. Tell us your lifting equipment and the load and we will specify the loops.
Last updated
The lifting loops are the part of a bulk bag that carries the whole load, so the style should follow how the bag is actually handled in your plant, warehouse and at the customer. This guide compares the three common styles and lists what to write in an RFQ.
Loop styles compared
See our single loop FIBC bag and 4-loop open top FIBC bag pages for the styles we offer.
| Style | How it is lifted | Best for |
|---|---|---|
| One loop | One central loop on a single crane hook | Fast hook-on handling with a crane or hoist |
| Two loops | Two loops, usually on fork tines or a two-point hook | Forklift handling where fewer sewn parts are wanted |
| Four loops | Four corner loops on forks, a spreader or a four-leg sling | General use; the most stable on pallets and forklifts |
How to decide
List every handling step: filling, forklift, crane, truck, container, discharge
Pick the style that works with the equipment at the most demanding step
Check hook or tine size against the loop width and length
Confirm the safe working load with us before ordering
What to write in your RFQ
- Lifting equipment: forklift, crane, hoist or spreader
- Load per bag and bag size
- Product and whether the bag is reused
- Top and bottom options, fabric and printing
FAQ
Which loop style is the most common?
Four corner loops are the most common general-purpose choice.
Can Mingzhe make one-loop and two-loop bags?
Yes. Tell us your lifting equipment and load. MOQ is 1,000 bags and the typical lead time is 15 days.
Get a quote
Send your product, fill weight and how you fill, lift and empty the bag. We reply with a recommended specification and a quote. MOQ 1,000 bags, typical lead time 15 days.